A design system that gave crop-insurance teams a shared language
I led the design system team and project at ProAg: planning workshops, the Figma library, foundations, documentation and the onboarding that teams adopted.
- Role
- Design system lead (team and project)
- Scope
- Planning workshops, Stakeholder interviews, Principles, Foundations, Figma library, Documentation, Onboarding, Governance
- Tools
- Figma

The problem
The UX strategy pointed to one cohesive experience across ProAg’s tools, and design and development needed a shared foundation to build it on.
How the work ran
Learn the business
ProAg’s systems, information architecture and teams.
Plan
Planning workshops and stakeholder interviews.
Pitch options
Approaches for IT and product management to weigh.
Set principles
Four principles the system answers to.
Build foundations
Color, type and icons.
Put it to work
Figma, documentation, ceremonies and onboarding.
1Learn the business
I studied ProAg’s systems and information architecture, and how its teams work.
2Plan
I ran planning workshops to decide what to tackle first, and interviewed stakeholders about how they work with design.
3Pitch options
I presented different design-system approaches, not a single answer, so IT and product management could weigh expectations and feasibility before committing.
4Set principles
I set four principles the system answers to: purposeful, versatile, compelling and thoughtful.
5Build foundations
The foundations cover color with accessible tints and shades, Proxima Nova in three weights, and icons built on the Carbon set, extended with agriculture-specific ones.
6Put it to work
I organized ProAg’s Figma instance around the components and created the documentation, ceremonies, templates and onboarding material for people joining. Defining components in shared chunks of information gave design and development one vocabulary, keeping components and products consistent.
Design system library and specsThe library, component specs, the working cadence and code handoff.Password requiredResult
ProAg teams came away with one documented system: principles, foundations, a working cadence and onboarding. The quoting concepts were among the first work to apply it.